Sign Up            OLA:TSX

Mineral Reserves
Gold   Proven     Probable     Proven & Probable  
    Tonnes Gold (g/t) Gold (oz) Tonnes Gold (g/t) Gold (oz) Tonnes Gold (g/t) Gold (oz)
Camino Rojo Mexico 14,595,000 0.79 370,000 29,424,000 0.70 661,000 44,019,000 0.73 1,031,000
Cerro Quema Panama 6,820,000 0.80 176,000 12,890,000 0.75 312,000 19,710,000 0.77 488,000
Total GOLD   21,415,000 0.79 546,000 42,314,000 0.72 973,100 63,729,000 0.74 1,519,000
                     
Silver   Proven     Probable     Proven & Probable  
    Tonnes Silver (g/t) Silver(oz) Tonnes Silver (g/t) Silver(oz) Tonnes Silver (g/t) Silver(oz)
                     
Camino Rojo Mexico 14,595,000 15.1 7,104,000 29,424,000 13.7 12,991,000 44,019,000 14.2 20,095,000
Total SILVER   14,595,000 15.1 7,104,000 29,424,000 13.7 12,991,000 44,019,000 14.2 20,095,000
           
Measured and Indicated Mineral Resources
Note: Inclusive of Mineral Reserves; columns may not add exactly because of rounding
Gold   Measured Indicated Total Measured & Indicated
    Tonnes Gold (g/t) Gold (oz) Tonnes Gold (g/t) Gold (oz) Tonnes Gold (g/t) Gold (oz)
                     
Camino Rojo Leach (Oxide) MEXICO 19,391,000 0.77 482,000 75,249,000 0.70 1,681,000 94,640,000 0.71 2,163,000
Camino Rojo (Sulphide)   3,358,000 0.69 74,000 255,445,000 0.88 7,221,000 258,803,000 0.88 7,296,000
Total Camino Rojo   22,749,000 0.76 556,000 330,694,000 0.84 8,902,100 353,443,000 0.83 9,459,000
                     
Cerro Quema (Oxide)   7,053,000 0.82 185,000 16,880,000 0.67 367,000 23,932,000 0.72 552,000
Cerro Quema (Sulphide) PANAMA 802,000 0.44 11,000 10,204,000 0.42 136,000 11,006,000 0.41 146,000
Total Cerro Quema   7,855,000 0.78 196,000 27,084,000 0.58 503,000 34,938,000 0.62 698,000
Total GOLD   30,604,000 0.77 753,000 357,778,000 0.82 9,406,000 388,381,000 0.81 10,159,000
           
Silver   Measured Indicated Total Measured & Indicated
    Tonnes Silver (g/t) Silver (oz) Tonnes Silver (g/t) Silver (oz) Tonnes Silver (g/t) Silver (oz)
Camino Rojo Leach (Oxide) MEXICO 19,391,000 14.9 9,305,000 75,249,000 12.2 29,471,000 94,640,000 12.7 38,776,000
Camino Rojo (Sulphide)   3,358,000 9.2 997,000 255,445,000 7.4 60,606,000 258,803,000 7.4 61,603,000
Total SILVER   22,749,000 14.1 10,302,000 330,694,000 8.5 90,078,000 353,443,000 9.0 100,379,000
         
Lead   Measured Indicated Total Measured & Indicated
    Tonnes Lead (%) Lead (mlb) Tonnes Lead (%) Lead (mlb) Tonnes Lead (%) Lead (mlb)
Camino Rojo (Sulphide) MEXICO 3,358,000 0.13 9.3 255,445,000 0.07 404.3 258,803,000 0.07 413.6
Total LEAD   3,358,000 0.13 9.3 255,445,000 0.07 404.3 258,803,000 0.07 413.6
         
Zinc   Measured Indicated Total Measured & Indicated:
    Tonnes Zinc (%) Zinc (mlb) Tonnes Zinc (%) Zinc (mlb) Tonnes Zinc (%) Zinc (mlb)
Camino Rojo (Sulphide) MEXICO 3,358,000 0.38 28.2 255,445,000 0.26 1,468.7 258,803,000 0.26 1496.8
Total ZINC   3,358,000 0.38 28.2 255,445,000 0.26 1,468.7 258,803,000 0.26 1496.8
           
Inferred Mineral Resources                                                                                                                                                                               
Gold   Inferred
    Tonnes Gold (g/t) Gold (oz)
         
Camino Rojo Leach (Oxide) MEXICO 4,355,000 0.86 120,000
Camino Rojo (Sulphide)   56,564,000 0.87 1,577,000
Total Camino Rojo   60,919,000 0.87 1,697,000
         
Cerro Quema (Oxide) PANAMA 667,000 0.37 8,000
Cerro Quema (Sulphide)   373,000 0.30 4,000
Total Cerro Quema   1,040,000 0.34 12,000
Total GOLD   61,959,000 0.86 1,709,000
 
         
Silver   Inferred
    Tonnes Silver (g/t) Silver (oz)
Camino Rojo Leach (Oxide) MEXICO 4,355,000 5.6 805,000
Camino Rojo (Sulphide)   56,564,000 7.9 13,713,000
Total SILVER   60,919,000 7.5 14,518,000
     
Lead   Inferred
    Tonnes Lead (%) Lead (mlb)
Camino Rojo (Sulphide) MEXICO 56,564,000 0.05 63.1
Total LEAD   56,564,000 0.05 63.1
     
Zinc   Inferred
    Tonnes Zinc (%) Zinc (mlb)
Camino Rojo (Sulphide) MEXICO 56,564,000 0.23 290.4
Total ZINC   56,564,000 0.23 290.4

 The Mineral Reserve and Mineral Resource estimates reported on this website were prepared in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. 

For further details with respect to the scientific and technical information contained in this website

  1. For Cerro Quema: “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” dated August 15, 2014 with an effective date of June 30, 2014;
  2. For Camino Rojo: June 25, 2019 News Release “Orla Mining Announces Positive Feasibility Study Results for The Camino Rojo Oxide Gold Project”

Available on this website and on SEDAR profiles of the Company at www.sedar.com

Hans Smit, P.Geo., Chief Operating Officer, is a “qualified person” as such term is defined in NI 43-101 and has reviewed and approved the technical information and data included in this website and has verified that no limitations were imposed on his verification process of the website. The information contained herein is subject to all of the assumptions, qualifications and procedures set out in each of the technical reports and reference should be made to the full details of the technical reports.

Please refer to our legal disclaimer.