Sign Up            OLA:TSX

Reserves

Gold

 

Proven

Probable

Proven & Probable

Location

Tonnes

Gold (g/t)

Gold (oz)

Tonnes

Gold (g/t)

Gold (oz)

Tonnes

Gold (g/t)

Gold (oz)

Cerro Quema

PANAMA

6,820,000

0.8

176,000

12,890,000

0.75

312,000

19,710,000

0.77

488,000

 

Measured and Indicated Resources

Gold

 

Measured

Indicated

Total Measured & Indicated

 

Tonnes

Gold (g/t)

Gold (oz)

Tonnes

Gold (g/t)

Gold (oz)

Tonnes

Gold (g/t)

Gold (oz)

Cerro Quema (Oxide)

 

7,052,600

0.820

184,900

16,879,800

0.673

367,500

23,932,400

0.718

 552,080

Cerro Quema (Sulphide)

PANAMA

802,000

0.440

 11,345

10,203,900

0.415

 136,108

11,005,900

0.413

 146,164

Total Cerro Quema

 

7,854,600

0.781

 197,277

27,083,700

0.576

 503,608

34,938,300

0.622

 698,244

                     

Camino Rojo Leach (Oxide)

 

16,147,000

0.794

412,100

84,692,000

0.734

1,969,300

100,839,000

0.734

2,381,300

Camino Rojo Mill (Sulphide)

MEXICO

9,818,000

0.864

272,600

244,251,000

0.890

6,992,200

254,069,000

0.889

7,264,800

Total Camino Rojo

 

25,965,000

0.820

684,600

328,943,000

0.847

8,961,500

354,908,000

0.845

9,646,100

Total GOLD

 

33,819,600

0.811

881,877

356,026,700

0.827

9,465,108

389,846,300

0.825

10,344,344

 

Silver

 

Measured

Indicated

Total Measured & Indicated

 

Tonnes

Silver (g/t)

Silver (oz)

Tonnes

Silver (g/t)

Silver (oz)

Tonnes

Silver (g/t)

Silver (oz)

Camino Rojo Leach (Oxide)

 

16,147,000

15.44

8,014,000

84,692,000

12.15

33,076,000

100,839,000

12.67

41,091,000

Camino Rojo Mill (Sulphide)

MEXICO

9,818,000

7.450

2,352,000

244,251,000

7.5

58,934,000

254,069,000

7.5

61,286,000

Total SILVER

 

25,965,000

12.420

10,367,000

328,943,000

8.7

92,010,000

354,908,000

8.97

102,377,000

 

Lead

 

Measured

Indicated

Total Measured & Indicated

 

Tonnes

Lead (%)

Lead (mlb)

Tonnes

Lead (%)

Lead (mlb)

Tonnes

Lead (%)

Lead (mlb)

Camino Rojo Leach (Oxide)

 

16,147,000

0.26

92.1

84,692,000

0.19

363.7

100,839,000

0.21

455.8

Camino Rojo Mill (Sulphide)

MEXICO

9,818,000

0.08

16.4

244,251,000

0.07

385.6

254,069,000

0.07

402

Total LEAD

 

25,965,000

0.19

108.5

328,943,000

0.1

749.3

354,908,000

0.11

857.8

 

Zinc

 

Measured

Indicated

Total Measured & Indicated:

 

Tonnes

Zinc (%)

Zinc (mlb)

Tonnes

Zinc (%)

Zinc (mlb)

Tonnes

Zinc (%)

Zinc (mlb)

Camino Rojo Leach (Oxide)

 

16,147,000

0.39

140.6

84,692,000

0.36

674.3

100,839,000

0.37

814.8

Camino Rojo Mill (Sulphide)

MEXICO

9,818,000

0.28

60.1

244,251,000

0.26

1398.2

254,069,000

0.26

1458.3

Total ZINC

 

25,965,000

0.35

200.7

328,943,000

0.29

2072.5

354,908,000

0.29

2273.2

                       

 

 

Inferred Resources 

Gold

 

Inferred

 

Tonnes

Gold (g/t)

Gold (oz)

Cerro Quema (Oxide)

 

667,000

0.370

 7,936

Cerro Quema (Sulphide)

PANAMA

373,100

0.296

 3,550

Total Cerro Quema

 

1,040,100

0.343

 11,486

         

Camino Rojo Leach (Oxide)

 

4,858,000

0.772

120,600

Camino Rojo Mill (Sulphide)

MEXICO

60,342,000

0.875

1,696,900

Total Camino Rojo

 

65,200,000

0.867

1,817,500

Total GOLD

 

66,240,100

0.859

1,828,986

 

Silver

 

Inferred

 

Tonnes

Silver (g/t)

Silver (oz)

Camino Rojo Leach (Oxide)

 

4,858,000

5.6

874,000

Camino Rojo Mill (Sulphide)

MEXICO

60,342,000

7.9

15,334,000

Total SILVER

 

65,200,000

7.73

16,208,000

 

Lead

 

Inferred

 

Tonnes

Lead (%)

Lead (mlb)

Camino Rojo Leach (Oxide)

 

4,858,000

0.07

7

Camino Rojo Mill (Sulphide)

MEXICO

60,342,000

0.05

68.1

Total LEAD

 

65,200,000

0.05

75.2

 

Zinc

 

Inferred

 

Tonnes

Zinc (%)

Zinc (mlb)

Camino Rojo Leach (Oxide)

 

4,858,000

0.24

25.9

Camino Rojo Mill (Sulphide)

MEXICO

60,342,000

0.23

310.8

Total ZINC

 

65,200,000

0.23

336.8

 The Mineral Reserve and Mineral Resource estimates reported on this website were prepared in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. 

Further details with respect to the scientific and technical information contained in this website can be found in the following NI 43-101 technical reports which are available on this website and on SEDAR profiles of the Company at www.sedar.com:

  1. “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” dated August 15, 2014 with an effective date of June 30, 2014; and
  2. “CSA NI43-101 Technical Report on the Camino Rojo Gold Project, Municipio of Mazapil, Zacatecas, Mexico” dated January 24, 2018.

Marc Prefontaine, P.Geo., Chief Executive Officer, is a “qualified person” as such term is defined in NI 43-101 and has reviewed and approved the technical information and data included in this website and has verified that no limitations were imposed on his verification process of the website. The information contained herein is subject to all of the assumptions, qualifications and procedures set out in each of the technical reports and reference should be made to the full details of the technical reports.

Please refer to our legal disclaimer.