July 17, 2025 Camino Rojo 43-101 Technical Report Update (July 17, 2025) Read: Camino Rojo 43-101 Technical Report Update (July 17, 2025)
January 11, 2021 Camino Rojo Unconstrained Feasibility Study (January 11, 2021) Read: Camino Rojo Unconstrained Feasibility Study (January 11, 2021)
June 25, 2019 Camino Rojo Feasibility Study (June 25, 2019) Read: Camino Rojo Feasibility Study (June 25, 2019)
March 11, 2019 Camino Rojo Preliminary Economic Assessment 43-101 Technical Report Amended (March 11, 2019) Read: Camino Rojo Preliminary Economic Assessment 43-101 Technical Report Amended (March 11, 2019)