Projects

Reserves and Resources

  • 2019 Mineral Reserves and Resources

    Proven and Probable Gold Reserves

    1.5 million Au oz.

     

    Measured and Indicated Gold Resources

    10.2 million Au oz.

     

    Inferred Gold Resources

    1.7 Million Au oz.

    • Full Reserve and Resource Statement

    The Mineral Reserve and Mineral Resource estimates reported on this website were prepared in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. 

    For further details with respect to the scientific and technical information contained in this website

    1. For Cerro Quema: “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” dated August 15, 2014 with an effective date of June 30, 2014;

    2. For Camino Rojo: “Camino Rojo Project Feasibility Study NI 43-101 Technical Report” dated effective June 25, 2019.

    Available on this website and on SEDAR profiles of the Company at www.sedar.com

    Hans Smit, P.Geo., Chief Operating Officer, is a “qualified person” as such term is defined in NI 43-101 and has reviewed and approved the technical information and data included in this website and has verified that no limitations were imposed on his verification process of the website. The information contained herein is subject to all of the assumptions, qualifications and procedures set out in each of the technical reports and reference should be made to the full details of the technical reports.

    Please refer to our legal disclaimer. 


© 2019 Orla Mining Ltd.
All rights reserved.
Disclaimer

Subscribe to our Email List