Assets

Reserves and Resources

  • Proven and Probable Mineral Reserves

    GOLD

    PROVEN

    PROBABLE

    PROVEN & PROBABLE

     

    Tonnes
    000's

    Gold
    (g/t)

    Gold
    (koz)

    Tonnes
    000's

    Gold
    (g/t)

    Gold
    (koz)

    Tonnes
    000's

    Gold
    (g/t)

    Gold
    (koz)

    MEXICO

    Camino Rojo

    18,067

    0.80

    466

    49,296

    0.71

    1,123

    67,363

    0.73

    1,588

    PANAMA

    Cerro Quema

    21,700

    0.80

    562

    21,700

    0.80

    562

    Total GOLD

    18,067

    0.80

    466

    70,996

    0.74

    1,685

    89,063

    0.75

    2,150

     

     

     

     

     

     

     

     

     

    SILVER

    PROVEN

    PROBABLE

    PROVEN & PROBABLE

     

    Tonnes
    000's

    Silver
    (g/t)

    Silver
    (koz)

    Tonnes
    000's

    Silver
    (g/t)

    Silver
    (koz)

    Tonnes
    000's

    Silver
    (g/t)

    Silver
    (koz)

    MEXICO

    Camino Rojo

    18,067

    15.40

    8,951

    49,296

    14.20

    22,555

    67,363

    14.50

    31,506

    PANAMA

    Cerro Quema

    21,700

    2.18

    1,526

    21,700

    2.18

    1,526

    Total SILVER

    18,067

    15.40

    8,951

    70,996

    10.55

    24,081

    89,063

    11.54

    33,032

     

  • Measured and Indicated Mineral Resources

    GOLD

    MEASURED

    INDICATED

    MEASURED & INDICATED

     

     

    Tonnes
    000's

    Gold
    (g/t)

    Gold
    (koz)

    Tonnes 000's

    Gold
    (g/t)

    Gold
    (koz)

    Tonnes
    000's

    Gold
    (g/t)

    Gold
    (koz)

    MEXICO

    Camino Rojo
    (Oxide)

    19,391

    0.77

    482

    75,249

    0.70

    1,681

    94,640

    0.71

    2,163

     

    Camino Rojo
    (Sulphide)

    3,358

    0.69

    74

    255,445

    0.88

    7,221

    258,803

    0.88

    7,296

    Total Camino Rojo

    22,749

    0.76

    557

    330,694

    0.84

    8,902

    353,443

    0.83

    9,459

    PANAMA

    Cerro Quema
    (Oxide)

    30,793

    0.66

    651

    30,793

    0.66

    651

     

    Cerro Quema
    (Mixed)

    2,479

    0.52

    41

    2,479

    0.52

    41

     

    Caballito
    (Oxide)

    998

    0.49

    16

    998

    0.49

    16

     

    Caballito
    (Sulphide)

    31,952

    0.31

    315

    31,952

    0.31

    315

    Total Panama

    66,222

    0.48

    1,023

    66,222

    0.48

    1,023

    TOTAL GOLD

    22,749

    0.76

    557

    396,916

    0.78

    9,925

    419,665

    0.78

    10,482

               

    SILVER

    MEASURED

    INDICATED

    MEASURED & INDICATED

     

     

    Tonnes
    000's

    Silver
    g/t)

    Silver
    (koz)

    Tonne
     000's

    Silver
    (g/t)

    Silver
    (koz)

    Tonnes
    000's

    Silver
    (g/t)

    Silver
    (koz)

    MEXICO

    Camino Rojo
    (Oxide)

    19,391

    14.90

    9,305

    75,249

    12.20

    29,471

    94,640

    12.70

    38,776

     

    Camino Rojo
    (Sulphide)

    3,358

    9.20

    997

    255,445

    7.40

    60,606

    258,803

    7.40

    61,603

    Total Camino Rojo

    22,749

    14.10

    10,302

    330,694

    8.50

    90,078

    353,443

    8.80

    100,379

    PANAMA

    Cerro Quema
    (Oxide)

    30,793

    2.01

    1,992

    30,793

    2.01

    1,992

     

    Cerro Quema
    (Mixed)

    2,479

    2.58

    205

    2,479

    2.15

    205

     

    Caballito
    (Oxide)

    998

    2.10

    67

    998

    2.1

    67

     

    Caballito
    (Sulphide)

    31,952

    2.20

    2,260

    31,952

    2.2

    2,260

    Total Panama

    66,222

    2.12

    4,524

    66,222

    2.12

    4,524

    TOTAL SILVER

    22,749

    14.10

    10,302

    396,916

    7.41

    94,602

    419,665

    7.77

    104,903

               

    COPPER

    MEASURED

    INDICATED

    MEASURED & INDICATED

     

     

    Tonnes 000's

    CuEq (%)

    Cu (%)

    CuEq (Mlbs)

    Cu (Mlbs)

    Tonnes 000's

    CuEq (%)

    Cu (%)

    CuEq (Mlbs)

    Cu (Mlbs)

    Tonnes 000's

    CuEq (%)

    Cu (%)

    CuEq (Mlbs)

    Cu (Mlbs)

    PANAMA

    Caballito

    31,952

    0.96

    0.83

    676

    585

    31,952

    0.96

    0.83

    676

    585

    TOTAL COPPER

    31,952

    0.96

    0.83

    676

    585

    31,952

    0.96

    0.83

    676

    585

                     

    LEAD

    MEASURED

    INDICATED

    MEASURED & INDICATED

     

    Tonnes
    000's

    Lead
    (%)

    Lead
    (Mlb)

    Tonnes
    000's

    Lead
    (%)

    Lead
    (Mlb)

    Tonnes
    000's

    Lead
    (%)

    Lead
    (Mlb)

    MEXICO

    Camino Rojo
    (Sulphide)

    3,358

    0.13

    9.3

    255,445

    0.07

    404.3

    258,803

    0.07

    413.6

    TOTAL LEAD

    3,358

    0.13

    9.3

    255,445

    0.07

    404.3

    258,803

    0.07

    413.6

     

     

     

     

     

     

     

     

    ZINC

    MEASURED

    INDICATED

    MEASURED & INDICATED

     

    Tonnes
    000's

    Zinc
    (%)

    Zinc
    (Mlb)

    Tonnes
    000's

    Zinc
    (%)

    Zinc
    (Mlb)

    Tonnes
    000's

    Zinc
    (%)

    Zinc
    (Mlb)

    MEXICO

    Camino Rojo
    (Sulphide)

    3,358

    0.38

    28.2

    255,445

    0.26

    1,468.7

    258,803

    0.26

    1,496.8

    TOTAL ZINC

    3,358

    0.38

    28.2

    255,445

    0.26

    1,468.7

    258,803

    0.26

    1,496.8

     

  • Inferred Mineral Resources

    GOLD

     

    INFERRED

     

     

    Tonnes 000's

    Gold (g/t)

    Gold (koz)

    MEXICO

    Camino Rojo (Oxide)

    4,355

    0.86

    119.8

    Camino Rojo (Sulphide)

    56,564

    0.87

    1576.9

     

    Total Camino Rojo

    60,919

    0.87

    1696.7

    PANAMA

    Cerro Quema (Oxide)

    3,613

    0.31

    36

     

    Cerro Quema (Mixed)

    250

    0.39

    3

     

    Caballito (Oxide)

    3,619

    0.36

    41

     

    Caballito (Sulphide)

    22,569

    0.21

    155

     

    Total Panama

    30,051

    0.24

    234

    TOTAL GOLD

    90,970

    0.66

    1930.7

     

     

     

     

     

    SILVER

    INFERRED

     

     

    Tonnes 000's

    Silver (g/t)

    Silver (koz)

    MEXICO

    Camino Rojo (Oxide)

    4,355

    5.80

    805

    Camino Rojo (Sulphide)

    56,564

    7.50

    13,713

     

    Total Camino Rojo

    60,919

    7.40

    14,518

    PANAMA

    Cerro Quema (Oxide)

    3,613

    2.55

    296

     

    Cerro Quema (Mixed)

    250

    0.66

    5

     

    Caballito (Oxide)

    3,619

    2.30

    268

     

    Caballito (Sulphide)

    22,569

    1.18

    856

     

    Total PANAMA

    30,051

    1.49

    1,425

    TOTAL SILVER

    90,970

    5.45

    15,943

     

     

     

     

     

    COPPER

    INFERRED

     

     

    Tonnes 000's

    CuEq (%)

    Cu (%)

    CuEq (Mlbs)

    Cu (Mlbs)

    PANAMA

    Caballito

    22,569

    0.85

    0.77

    425

    381

    TOTAL COPPER

     

    22,569

    0.85

    0.77

    425

    381

     

     

     

     

     

     

     

    LEAD

     

    INFERRED

      

    Tonnes 000's

    Lead (%)

    Lead (Mlb)

    MEXICO

    Camino Rojo (Sulphide)

    56,564

    0.05

    63.1

    TOTAL LEAD

    56,564

    0.05

    63.1

         

    ZINC

     

    INFERRED

      

    Tonnes 000's

    Zinc (%)

    Zinc (Mlb)

    MEXICO

    Camino Rojo (Sulphide)

    56,564

    0.23

    290.4

    TOTAL ZINC

    56,564

    0.23

    290.4

  • The Mineral Reserve and Mineral Resource estimates reported on this website were prepared in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. 

    For further details with respect to the scientific and technical information contained in this document:

    For Camino Rojo: “Camino Rojo Project Feasibility Study NI 43-101 Technical Report” dated effective June 25, 2019 and “Unconstrained Feasibility Study NI 43-101 Technical Report on the Camino Rojo Gold Project – Municipality of Mazapil, Zacatecas, Mexico” dated January 11, 2021

    For Cerro Quema and Caballito refer to: “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project” dated January 18, 2022.

    The detailed technical report is available on SEDAR under the Company's profile at www.sedar.com and at on Orla’s website at www.orlamining.com.

    Mr. J. Andrew Cormier, P. Eng., and Mr. Sylvain Guerard, P. Geo., who are the Qualified Persons as defined under NI 43-101 standards, reviewed and approved the technical information and data included in this website and has verified that no limitations were imposed on his verification process of the website. The information contained herein is subject to all of the assumptions, qualifications and procedures set out in each of the technical reports and reference should be made to the full details of the technical reports.

    Please refer to our legal disclaimer. 


©2022Orla Mining Ltd.
All rights reserved.
Disclaimer

Subscribe to our Email List